Skip to Navigation Skip to Content
Start Date: 2024
  • Project:                         Straightway and Hyannisport Water Treatment Facility Improvements (CCC File No: 24029)
  • Project Applicant:      Town of Barnstable
  • Property Owner:        Town of Barnstable
  • Project Location:        228 Straightway, 0 Old School House Rd., and 132 Smith Street, Barnstable, MA
  • Map/Parcel:                 267-099, 267-190, 268-099
  • Project Description:   The Project proposed to expand and improve the Straightway and Hyannisport Water Treatment Facilities. The proposal includes winterization of existing facilities to allow year-round use, construction of a new +/- 11,000-sf water treatment facility, replacement of certain existing wells, and stormwater infrastructure improvements.

SUBMIT A PUBLIC COMMENT

Project Resources

View All Resources

119K pdf
Jan 10, 2025
2025-01-30 Straightway & Hyannisport Water Treatment Facility Exemption Hearing
NOTICE: To view the posting date/time and materials related to agenda items, please visit the Cape Cod Commission’s official posting location at www.capecodcommission.org/
230K pdf
Jan 03, 2025
2025-01-03 Hyannisport Water Treatment-Nitrogen Loading Memo
Page 1 of 2 January 2025 © 2025 Kleinfelder www.kleinfelder.com KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p | 617.497.7800 f | 617.498.4630 M EMO R A N D UM TO…
259K pdf
Dec 12, 2024
2024-12-12 Hyannisport Water Treatment-Cover Letter
24003062 Page 1 of 5 December 2024 © 2023 Kleinfelder www.kleinfelder.com KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p | 617.497.7800 f | 617.498.4630 12/12/2024…
Search Circle Icon Search Icon Document Icon Video Icon PDF Icon CSV/XLS Icon