This Regulatory Update provides a status on projects currently under review by the Cape Cod Commission. Visit www.capecodcommission.org/regulatory for a full overview of our Regulatory program and answers to frequently asked questions.


35 Scudder Residential Community (CCC File No. 20065)
35 Scudder Avenue, Hyannis

The Commission acted favorably in February 2021 on a Notice of Intent (NOI) for a Development Agreement submitted by applicant LMC. The NOI is in relation to a proposal to redevelop the site of the Twin Brooks golf course with a new multifamily residential community that includes 312 rental homes in 13 buildings. The Cape Cod Commission deemed the applicant's Development Agreement Application complete. The subcommittee hearing on the Project opened on March 22, 2022, and continued hearings were held April 12, 2022, May 17, 2022, May 31, 2022, June 8, 2022, and July 12, 2022. A subcommittee meeting was held on July 28, 2022. A subcommittee hearing to review a draft Development Agreement was noticed for and held on December 20, 2022 and continued to January 5, 2023.

New England Wind Connector (CCC File No. 22005)
Barnstable

The Commission received the Certificate of the Secretary of Energy and Environmental Affairs on the Project’s Final Environmental Impact Report on January 28, 2022. The Project, which will be reviewed as a Development of Regional Impact (DRI), proposes to deliver power generated by a large-scale renewable wind energy generation facility within the federally designated Wind Energy Area to the New England energy grid via offshore export cables from, and onshore underground cables to, a new substation in Barnstable and ultimately to an interconnection point at Eversource’s existing West Barnstable Substation. A staff hearing officer opened the DRI hearing period procedurally on March 14, 2022. DRI Application materials were submitted on June 10, 2022, which are under review by staff. The hearing period was extended by mutual agreement to March 10, 2022. No substantive hearings have been scheduled.

Falmouth Rd Market (CCC File No. 21015)
647 Falmouth Rd/9 Shellback Way, Mashpee

The Commission received a mandatory Development of Regional Impact (DRI) referral from the Town of Mashpee on August 29, 2022 for a 13,229 square foot retail grocery store with associated parking on a 3.97-acre parcel. DRI Application materials were submitted on September 16, 2022. A staff hearing officer opened the DRI hearing period procedurally on October 28, 2022. A substantive subcommittee hearing was held on November 9, 2022 and continued to December 12, 2022, where it was further continued to January 3, 2023.

Pound Pond Flood Mitigation (CCC File No. 22015)
Lower County Road, Dennis

The Commission received the Certificate of the Secretary of Energy and Environmental Affairs on the Project’s Rollover Final Environmental Impact Report on August 29, 2022. The Project proposes to restore Pound Pond at Seaview Park in Dennis to provide water quality and flood plain improvements. The limit of work is approximately 6.0 acres and will include approximately 496 linear feet of stream daylighting, removal of a 30-inch culvert pipe, and a proposed pond with a surface area of approximately 1.1 acres. A staff hearing officer opened the DRI hearing period procedurally on October 13, 2022. The hearing period was extended by mutual agreement to December 1, 2023. No substantive hearings have been scheduled.

27 Crosby-Bingham Pier Modifications (CCC File No. 22011)
27 Crosby Lane, East Falmouth

The Commission received the Certificate of the Secretary of Energy and Environmental Affairs on the Project’s Single Environmental Impact Report on October 31, 2022. The Project is located on a private single-family residential property on the Moonakis River and proposes to reconfigure, extend, and repair an existing pier to provide safe access for its users. The hearing period was opened procedurally by hearing officer on December 15, 2022. No application has been received, and no substantive hearings have been scheduled.

96 Megansett Bourne (CCC File No. 22012)
96 Megansett Road, Bourne

The Commission received the Certificate of the Secretary of Energy and Environmental Affairs on the Project’s Single Environmental Impact Report on October 31, 2022. The Project includes constructing a new single-family home and associated improvements and structures, including a stormwater management system and construction of pier and floating dock. The hearing period was opened procedurally by hearing officer on December 15, 2022. No applications have been submitted and no substantive hearings have been scheduled.

 

 

 

 

Related Posts

OC tile
September 30, 2024
OneCape 2024 - Thank You
Posted in Newsletter, OneCape
September 30, 2024
OneCape 2024: A Resilient Region
Posted in Newsletter, OneCape
September 30, 2024
OneCape Awards 
Posted in Newsletter, OneCape
Search Circle Icon Search Icon Document Icon Video Icon PDF Icon CSV/XLS Icon