Regulatory Update | June 2023 

This Regulatory Update provides a status on projects currently under review by the Cape Cod Commission. Visit www.capecodcommission.org/regulatory for a full overview of our Regulatory program and answers to frequently asked questions.   

Falmouth AMP Solar (CCC File No. 23008)  
48 Theatre Drive, Falmouth 

The Commission received a Development of Regional Impact (DRI) referral from the Town of Falmouth on April 28, 2023. The Project proposes to redevelop a portion of the existing Cape Cod Country Club with a 23-megawatt solar energy generation facility with battery storage. No substantive hearings have been scheduled. 

Marstons Mills Cranberry Bogs (CCC File No. 23009)  
710 River Road and 110 Bog Road, Barnstable 

The Commission received a DRI Exemption application for the Project on May 15, 2023. The Project proposes to divide two parcels and to convey a portion of each parcel for ecological restoration and conservation purposes. On June 8, 2023, the Commission held a hearing on the Project and voted to approve the Exemption. 

Cable 91 Replacement Project (CCC File No. 22025)  
Falmouth  

The Commission received the Certificate of the Secretary of Energy and Environmental Affairs on the Project’s Final Environmental Impact Report on May 17, 2023. The Project proposes to improve the reliability of grid-based electricity by replacing an existing Eversource distribution cable between Falmouth and Martha’s Vineyard. No substantive hearings have been scheduled. 

Pound Pond Flood Mitigation (CCC File No. 22015)  
Lower County Road, Dennis  

The Commission received the Certificate of the Secretary of Energy and Environmental Affairs on the Project’s Rollover Final Environmental Impact Report on August 29, 2022. The Project proposes to restore Pound Pond at Seaview Park in Dennis to provide water quality and flood plain improvements. The limit of work is approximately 6.0 acres and will include approximately 496 linear feet of stream daylighting, removal of a 30-inch culvert pipe, and a proposed pond with a surface area of approximately 1.1 acres. A staff hearing officer opened the DRI hearing period procedurally on October 13, 2022. The hearing period was extended by mutual agreement to December 1, 2023. No substantive hearings have been scheduled. 

Martha’s Vineyard Reliability Project (CCC File No. 22009)  
96 Megansett Road, Bourne  

The Commission received the Certificate of the Secretary of Energy and Environmental Affairs on the Project’s Single Environmental Impact Report on February 17, 2023. The Project proposes to improve the reliability of grid-based electricity on Martha’s Vineyard by installing an additional cable. The Project will include an approximately 2.7-mile underground duct and manhole system from the existing Eversource Substation off Stephens Lane in Falmouth to the landfall site at Surf Drive Beach in Falmouth and a submarine cable across Vineyard Sound. A DRI Application has been submitted and is under review by Commission staff. The hearing period was opened procedurally on April 3, 2023. A substantive hearing was held April 27, 2023 and continued to a meeting of the full Commission on May 11, 2023 where the Commission voted to approve the Project, with conditions. 

35 Scudder Residential Community Development Agreement (CCC File No. 20065)   
35 Scudder Avenue, Hyannis, MA  

Quarterra Multifamily Communities, LLC f/k/a Lennar Multifamily Communities proposed to redevelop a portion of a 54-acre +/- property at 35 Scudder Avenue in Barnstable, Massachusetts, (“Property”), which was previously used as a golf course, with a residential development consisting of 312 new rental units located in thirteen (13) multifamily buildings, a recreation building, and other associated improvements and amenities (“Project”). On February 2, 2023, the Cape Cod Commission voted to approve and authorized the Chair to sign the Development Agreement on behalf of the Cape Cod Commission. The project is currently under appeal.  

 

 

 

 

Related Posts

OC tile
September 30, 2024
OneCape 2024 - Thank You
Posted in Newsletter, OneCape
September 30, 2024
OneCape 2024: A Resilient Region
Posted in Newsletter, OneCape
September 30, 2024
OneCape Awards 
Posted in Newsletter, OneCape
Search Circle Icon Search Icon Document Icon Video Icon PDF Icon CSV/XLS Icon